Part 3: Test Planning & Strategy (Performance Testing Revision Cheat Sheet)

 

📌 Importance of Planning

Without a proper plan, performance testing becomes random load generation. A clear strategy ensures relevance, accuracy, and stakeholder confidence.


🎯 Steps in Performance Test Planning

  1. Requirement Gathering

    • Understand business objectives (e.g., system must support 10,000 concurrent users).

    • Identify SLAs / KPIs (e.g., API response < 2 sec, error rate < 1%).

  2. Identify Performance Scenarios

    • Business-critical flows (e.g., login, checkout, search).

    • Peak load conditions (seasonal spikes, campaign launches).

    • Data volume considerations (DB growth, caching).

  3. Workload Modeling

    • Define user mix (e.g., 60% browsing, 30% checkout, 10% admin).

    • Determine concurrency model (open vs closed workload).

    • Set ramp-up, steady-state, ramp-down timelines.

  4. Environment Setup

    • Production-like test environment.

    • Isolate network dependencies.

    • Configure monitoring tools.

  5. Test Data Preparation

    • Unique test accounts, transactions, and datasets.

    • Ensure data refresh/reset strategy between test runs.

  6. Define Entry & Exit Criteria

    • Entry: environment ready, tools configured, data available.

    • Exit: SLA met, bottlenecks identified, analysis completed.


🛠️ Deliverables of Test Planning

  • Performance Test Plan Document.

  • Workload Models & Test Scenarios.

  • Monitoring & Data Strategy.

  • Risk Assessment (infra limits, tool constraints).

Comments

Popular posts from this blog

Performance Testing Interview Preparation Guide

Performance Testing Interview Tutorials

Performance Testing Interview Question - Part 02